#81862: "Contracts"
Apakah laporan ini berkenaan?
Apakah yang berlaku? Sila pilih pilihan di bawah
Apakah yang berlaku? Sila pilih pilihan di bawah
Sila semak apakah sudah ada laporan mengenai subjek yang sama
Jika ya, sila nyatakan untuk laporan ini. Laporan dengan undian yang paling diberikan PRIORITI!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Penerangan yang terperinci
-
• Sila salin/tampal mesej masalah yang anda dapat lihat di skrin, jika ada.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Tolong jelaskan apa yang anda ingin buat, apa yang telah anda buat dan apa yang telah terjadi
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apakah browser anda?
Google Chrome v109
-
• Tolong salin/lekat teks yang dipaparkan dalam bahasa inggeris dan bukannya bahasa anda. Sekiranya anda ada screenshot bug ini (amalan yang baik), anda boleh gunakan Imgur.com untuk muatnaik dan copy/paste pautan itu di sini.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Adakah teks ini tersedia dalam sistem terjemahan ? Jika ya, adakah ia diterjemahkan selama lebih daripada 24 jam?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apakah browser anda?
Google Chrome v109
-
• Tolong jelaskan cadangan anda dengan tepat dan ringkas supaya semudah mungkin untuk memahami apa yang anda maksudkan.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Apakah browser anda?
Google Chrome v109
-
• Apa yang dipaparkan pada skrin apabila anda disekat (Skrin kosong? Antara muka permainan? Mesej ralat?)
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Apakah browser anda?
Google Chrome v109
-
• Bahagian peraturan yang mana tidak dihormati oleh penyesuaian BGA
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Adakah kelanggaran peraturan boleh dilihat di ulangan permainan? Jikanya ya, pada langkah berapa?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apakah browser anda?
Google Chrome v109
-
• Apakan tindakan yang anda mahu lakukan?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Apa yang anda cuba lakukan untuk mencetuskan tindakan permainan ini?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). -
• Apa yang berlaku apabila anda cuba melakukan ini (mesej ralat, mesej bar status permainan, ...)?
• Apakah browser anda?
Google Chrome v109
-
• Pada peringkat mana semasa permainan , masalah itu berlaku (apakah arahan semasa permainan tersebut)?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Apa yang berlaku apabila anda cuba melakukan tindakan permainan (mesej ralat, mesej bar status permainan, ...)?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apakah browser anda?
Google Chrome v109
-
• Tolong jelaskan masalah pemaparan. Sekiranya anda ada screenshot bug ini (amalan yang baik), anda boleh gunakan Imgur.com untuk muatnaik dan copy/paste pautan itu di sini.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Apakah browser anda?
Google Chrome v109
-
• Tolong salin/lekat teks yang dipaparkan dalam bahasa inggeris dan bukannya bahasa anda. Sekiranya anda ada screenshot bug ini (amalan yang baik), anda boleh gunakan Imgur.com untuk muatnaik dan copy/paste pautan itu di sini.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Adakah teks ini tersedia dalam sistem terjemahan ? Jika ya, adakah ia diterjemahkan selama lebih daripada 24 jam?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Apakah browser anda?
Google Chrome v109
-
• Tolong jelaskan cadangan anda dengan tepat dan ringkas supaya semudah mungkin untuk memahami apa yang anda maksudkan.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Apakah browser anda?
Google Chrome v109
Laporan masa lalu
The elevation granted by the contract was automatically build because there was only one place available.
Contract rewards are not mandatory.
The conduit granted by the contract was automatically built.
When there isn't only one place available, there is an option to skip building the structure. It should always be an option.
Tambah sesuatu untuk laporan ini
- ID meja yang lain / gerakkan ID
- Adakah F5 meyelesaikan masalah ity?
- Adapah masalah itu berlaku beberapa kali? Selalu? Sekali-sekala?
- Sekiranya anda ada screenshot bug ini (amalan yang baik), anda boleh gunakan Imgur.com untuk muatnaik dan copy/paste pautan itu di sini.
